All posts by admin

Che sorpresa ti aspetta nel vivace casinò lazybar: generosi bonus, giri gratuiti e una selezione di giochi colorati renderanno la tua serata fantastica.

Here’s a breakdown of the local money for M-1 light rail project

From Detroit Crain’s Business

The Local Money
Here’s how the federally required $210 million local funding match for the $528 million Woodward rail project breaks down:

• $73 million from the forthcoming sale of $125 million in Capital Grant Receipts Revenue Bonds by the Detroit Department of Transportation.
The estimated annual $10 million interest payment on the bonds will be paid from other annual federal grants received by DDOT.
• $12 million from previously received federal transportation grants to DDOT, which will pay for planning and preliminary engineering.
• $25 million from a Transportation Investment Generating Economic Recovery grant, federal stimulus funding aimed at surface transportation projects. The grant was given to the Michigan Department of Transportation and then turned over to DDOT.
• $100 million in cash donations and tax breaks (such as federal New Markets Tax Credits) assembled by the M1 Rail consortium of private backers and foundations.
• The above funding is 40 percent of the total capital costs and makes the project eligible for $318 million in federal funding under the Federal Transit Administration’s New Starts program. The city must apply for the funding.

Annual Costs
The rail line’s yearly operations and maintenance costs are estimated to start at $2.1 million when the route begins service in 2015 and are expected to hit $16 million by 2030. An analysis of the project prepared for the Detroit City Council forecasts the line will carry 1.8 million riders annually — a number kept flat through 2030 in revenue and expense projections as a conservative estimate, the city has said. The city’s plan to cover the line’s cost breaks down as:

• $2.8 million from fares (at $1.50 per rider).
• $5 million from federal Congestion Mitigation and Air Quality grants.
• $2 million from the state’s Public Act 51, which is transportation project funding.
• $5 million from other state pledges.
• $1 million from federal Section 5309 Fixed Guideway Modernization Funds.
• $2 million from city’s general fund.

Source: http://www.crainsdetroit.com/article/20110529/SUB01/305299991/private-money-on-the-line-woodward-rail-donors-wait-for-layout-they#

Woodward Light Rail faces tough questions

From The South End
(Wayne State student newspaper)

Questions about the purpose and design of the Woodward Light Rail project have arisen while it slowly but surely makes its way through the planning and approval phases.

One vision by area entrepreneurs is for the train to run trolley-style down the sides of Woodward Avenue at slow speeds to promote local retail and commerce. Transportation advocates, on the other hand, are promoting a high-speed train moving down the center of Woodward to effectively move people in and out of the downtown area.

Megan Owens, director of Transportation Riders United, a nonprofit advocate for public transportation, said that the differences between the two plans lie in timeliness and reliability.

If the train runs along the side, then it would have to compete with traffic, cars trying to parallel park and double-parked vehicles, which could potentially delay the train. On the other hand, Owens said, if the train runs in a center lane on Woodward, it wouldn’t be blocked by traffic and would thus be more reliable.

Another concern is how the light rail train would affect bicyclists.

“By law, bicycles are supposed to travel on the road in the slow lane, on the side lane,” Owens said. “If there are train tracks in that lane, it makes it very unsafe for bicycles and really ends up barring bicycles from Woodward Avenue.”

She said TRU supports having the Woodward Light Rail run in the center of Woodward Avenue.

Matt Cullen, CEO of the M-1 group of private investors who are partially funding the project, said that while transportation is important, members of the M-1 group are “fundamentally…certainly keenly focused on the economic development in the downtown core.”

People and corporations constituting the M-1 group of investors include Quicken Loans, Roger Penske, Wayne State, Henry Ford Hospital, Peter Karmanos Jr., the Illitches, Compuware, the Kresge Foundation and Detroit Economic Growth Corporation.

In five years, Cullen said, the Woodward Light Rail will hopefully have major economic benefits for Detroit.

“We’ll be starting to see economic development resulting from the ability to move people to and from jobs, and from being able to move people within the downtown so that they can take advantage of the attractions that are within the downtown,” he said.

Ideally, Cullen said, the Woodward Light Rail would not only transport local people, but also work in conjunction with a high-speed train between Detroit and Chicago to help bring visitors to the downtown area.

Cullen said the M-1 investors decided to fund the light rail after seeing the potential for such a transit system in the city.

“I think people just fundamentally believed that a transit project in Detroit was a compelling need and that (it) would really help the development within the city of Detroit,” he said.

He said it was difficult to persuade federal government officials to approve funding because of some of the “failed history within the region of transit.”

Detroit’s People Mover could be considered an example of such a failure. Although the 2.9-mile system charges each passenger 50 cents, it costs $4.28 to move a passenger one mile, according to statistics from the 2009 National Transit Database.

Bob Berg, partner and vice president of Berg Muirhead and Associates, which handles media relations work for Detroit, said the People Mover was never intended to be a stand-alone system. When it was designed in the 1980s, it was intended to work in conjunction with a light rail train, “so it’s never really realized the potential that was envisioned when it was first designed and built,” he said.

Berg said the ultimate design of the light rail system will be decided by the planning process and the federally-deemed criteria concerning the impact on the surrounding area, traffic, pedestrian safety and the environment.

“The idea is to let the process make the determination,” Berg said. “Once you’re done with the process, the decision sort of makes itself.”

The next step, he said, is to receive the final environmental impact statement, which is projected to be finished by the end of June. After the green light is given for preliminary engineering work, groundbreaking on the project could start during the later half of next year.

Originally, the light rail was supposed to be constructed in two phases: from downtown Detroit to West Grand Boulevard, and then from West Grand Boulevard to Eight Mile Road. Now, Berg said, the project will be completed as one project running from the downtown area to Eight Mile Road.

Approximately $500 million — upwards of 60 percent of total funding – is coming from the Federal Transit Administration, Berg said. The rest of the money will come from the private funding of the M-1 group and from Detroit’s general fund. Additionally, he said the annual estimated operating cost is about $10 million. Approximately $8 million will come from federal funding, while $2 million will come from city funds.

The light rail system could have significant economic ramifications. For every dollar invested in a light rail system, Berg said, there is $8 in private investments in restaurants, homes, offices and retail.

Owens said Detroit’s spending on public transit runs far behind spending on transit in other places. The average metropolitan area spends over $200 per capita per year on public transit, she said, while the Detroit region spends only $75.

“We get what we pay for,” Owens said.

She added that right now, city officials are evaluating the public’s input from the public comment stage, which began January 28 and ended March 14.

“I can tell you that we did get unofficial word that they were almost entirely positive,” she said. “All but a handful were in support of developing a light rail.”

Cullen said that although a balance needs to be found between the two visions for the light rail train, he did not think there was a “fundamental difference” between the two viewpoints.

“I don’t think that there’s a choice that it’s one or the other,” Cullen said. “I think clearly the reality is that it needs to be both. It needs to be a bit of a hybrid.”

Source: http://thesouthend.wayne.edu/index.php/article/2011/05/woodward_light_rail_faces_tough_questions

Columnist: Obstacles ahead, but light rail worth the work

From the Detroit Free Press

In his 1936 essay “The Crack-Up,” novelist F. Scott Fitzgerald said real intelligence is the ability to “see that things are hopeless and yet be determined to make them otherwise.” Seventy-five years later, anyone who has fought for mass transit in southeast Michigan can still feel him.

Despite a soul-shriveling history of detours and dead-ends, transit advocates throughout the suburbs and in this great city keep pushing. (And, yes, I consider Detroit a great city. If that makes me deluded as well as intelligent, I’ll gladly accept both tags.)

The latest shot of hope is the Woodward Light Rail Project, a $500-million public-private partnership to run electric rail cars 9.3 miles up and down Woodward, from Hart Plaza to 8 Mile. As a city resident, I want this as much as anyone.

But it’s not a done deal, despite the unwavering confidence of Mayor Dave Bing and his project point man, Chief Financial Officer Norman White, who expect construction to start next year. The city and region can still blow this, and another failure would be near-fatal to efforts to build mass transit in this region.

Getting the money

The most immediate obstacle is collecting the $100 million pledged by private investors to complete Detroit’s local match for federal New Starts money. City leaders and private investors continue to work out differences over design, alignment and other issues. Maybe half the cheddar — including $35 million from the Kresge Foundation and $9 million from the Detroit Economic Growth Corp. — is a sure bet.

Not getting the full $100 million would not kill the project, but to compete with other cities, Detroit must get most of it. Meeting with the Free Press editorial board in mid-April, the mayor told me he needs investors to commit within 30 days. Thirty days have passed and nothing definitive has happened. A spokesperson for the M-1 Rail leadership team declined to comment through an e-mail on Friday, other than to say “they are not comfortable commenting on something the mayor said in a meeting they were not present at.”

Here’s an even bigger problem: Detroit’s application for federal assistance must explain how the city will pay to operate light rail. Fares will bring in maybe $3 million a year, but running the system will cost at least $10 million more. Facing a $150-million deficit, the city can’t do it alone. For now, there is no plan for a regional transit tax — or even a regional transit authority. That conversation must start now. With the rail line ending at 8 Mile, some suburban leaders are asking what’s in it for them.

The Woodward rail system could tap Michigan’s Comprehensive Transportation Fund, which helps run local transit agencies, including SMART. With only $160 million a year, however, the fund now covers only one-third of the costs of Michigan’s 75 transit agencies — dozens of which are near bankrupt or cutting service to stay solvent. Any plan to take loot from transit agencies around the state to pay for light rail in Detroit would likely set off a fight in the Legislature. Suburban leaders are already beefing about the 65/35 split in state and federal transit money between Detroit and its suburbs.

Federal Congestion Mitigation and Air Quality Improvement (CMAQ) money could also help pay operating costs. But the rail project would likely get only $1 million or $2 million a year — southeast Michigan receives only $6 million for transit altogether — and CMAQ funding is good for only three years.

More obstacles

Finally, the Federal Transit Administration won’t allow Detroit to weaken its already inadequate bus system to build a rail system — nor should it. More than 25% of Detroiters don’t have vehicles. Their needs come first. Besides, a rail line needs decent bus service to feed it.

City Council did the right thing in approving a bond issue that included $73 million for light rail. Still, repaying the 15-year issue with annual federal transportation grants carries some risks. It’s money that would otherwise go to Detroit’s bus system.

Federal New Starts grants are highly competitive. It’s not enough to have a good plan — only about one in five transit projects nationwide receive funding. No doubt, the Obama administration has taken a special interest in Detroit’s rail project. The feds want it to move forward, but the project still must compete with hundreds of others and get congressional approval.

All that said, I still believe this can happen. Light rail in Detroit could jump-start a first-class regional transit system and generate hundreds of millions of dollars of development, as White told me. But Detroit’s leaders must work out these problems now, maybe with some help from their regional partners.

Things might look hopeless at times, but transit advocates in Detroit and southeast Michigan must determine to make them otherwise.

JEFF GERRITT is a Free Press editorial writer.

Source: http://www.freep.com/article/20110522/OPINION02/105220456/Jeff-Gerritt-Obstacles-ahead-light-rail-worth-work?odyssey=nav%7Chead

Here’s a chance to help the Clare Depot restoration effort

MARP Members:

The city of Clare in Clare County was selected among 100 finalists nationwide to compete for the 2011 This place Matters Community Challenge sponsored by the National Trust for Historic Preservation.

Winning depends on how many voters (one email address per vote) click to vote for the Clare project. Top prize is $25,000 that Clare will put toward a major restoration of its historic 1895 Queen Anne depot. This link to the Main Street homepage has the information.

http://mainstreetclare.com/

Your support and votes will be appreciated.

Rosemary Horvath, MARP member

Letter: Rail will boost Michigan economy

From The Detroit News

Randal O’Toole of the Cato Institute claims Michigan “cooked the books” in  assessing the benefits of improved passenger rail service, but his critique is  deeply flawed (“The great train con,” May 12).

However, rail is a good deal for the state.

In his column, O’Toole said using the well-established economic concept  called “consumer surplus” as a rail benefit makes the case look better than it  really is. In so doing he falsely defines the term and neglects to mention that  it is frequently used in assessing benefits from highways and other facilities.  The Federal Highway Administration’s assessment, for example, “calculates user  benefits based on changes in consumer surplus for travelers.”

Estimating consumer surplus is a legitimate, time-tested way of predicting  value. And as the United States begins to modernize its rail system, the value  of those improvements is becoming clearer every day. We now have real cases in  which upgraded rail access is demonstrating value to riders and to local and  regional economies.

The 10-year-old Amtrak Acela, for example, is the closest thing to high-speed  passenger rail in the United States. It has allowed Amtrak to nearly double its  share of Washington-New York air and rail travelers, from 37 percent in 2000 to  69 percent in 2010. In contrast to conventional Amtrak trains, which at best  break even, the upgraded Acela brings in a 40 percent operating profit.

The Downeaster, an Amtrak-operated route, runs from Boston to Portland,  Maine. Between 2005 and 2011, service was increased from four to five daily  round trips, and travel time cut by 20 minutes.

These were relatively modest upgrades, but results were not. Ridership more  than doubled, to a half-million a year.

Closer to Michigan, work is under way on Midwest routes targeted by O’Toole.

Normal, Ill., is on Amtrak’s Chicago-St. Louis route. Even before the  national rail effort began in 2009, Illinois had added service on the line,  resulting in a 207 percent ridership increase between fiscal year 2006 and  fiscal year 2010.

In Normal, improving service and a new train-bus station, set to open in  2012, is spurring an estimated $200 million in private downtown development,  including a large hotel and a publicly funded conference center.

In general, based on these preliminary examples, plus experience with other  transportation facilities here and abroad, it’s clear that upgraded rail service  will create economic value by providing new access and connections across  Michigan, the region and the nation.

Better options for travelers, increased access and productivity for  businesses, and growth in jobs — that’s the promise of Michigan’s rail project.

Congratulations to the state of Michigan for choosing the right course on  behalf of its citizens.

Allen D. Biehler , former secretary of the Pennsylvania Department of  Transportation; executive committee member of the State Smart Transportation  Initiative at the University of Wisconsin

From The Detroit News: http://detnews.com/article/20110614/OPINION01/106140310/Letter–Rail-will-boost-Michigan-economy#ixzz1PGZTO3fU