Meeting Minutes – February 10, 2011 – Durand

DRAFT
MINUTES
MONTHLY MEMBERSHIP MEETING
MICHIGAN ASSOCIATION OF RAILROAD PASSENGERS
DURAND UNION STATION, DURAND
FEBRUARY 10, 2011

Those Signing In: Hugh Gurney, John DeLora, Steve T. Sobel, Dick Pekarek, Clark Charnetski, Norma Ward, John D. Langdon, Kay Chase, Dan Platz, Jim Hinkins, Robert Patterson, Diane Patterson, Pat Post, Doug Wilson, Bob Tischbein

Also Present: Bob Cosgrove, Sylvia Sanders, Bob Jones, Michael Melet, Dan Westcott, Barb Spaulding-Westcott

Call to Order: Chairman Tischbein called the meeting to order at 10:05 a.m.

Guest Speakers: Tischbein first introduced Robert Cosgove, a founding member of the Blue Water Chapter, National Railroad Historical Society and currently Curator of the Glancy Train Collections at the Detroit Historical Museum.  The Detroit River Railroad Tunnel celebrated its 100th anniversary during the summer of 2010.  Despite being unseen, the tunnel handles 25 freight trains each day and moves 460,000 cars annually.

The first train through the tunnel was a westbound Canada Southern passenger train called the Fast Western Express on July 26, 1910.  Previously, ferries carried trains across the Detroit River.  The Canada Southern ferried cars across from just north of Amherstburg on the Canadian site to Stony Island, then bridged to Grosse Isle, then bridged again to the American side of the river, then headed into the Brush Street Station in Detroit.  The Amherstburg Station is now the Gibson Gallery of Art and the Grosse Isle Station now houses the Grosse Isle Historical Society.

A railroad bridge would have had to clear the 150 foot masts of the sailing ships of the day, so a tunnel became the best option.  Plans for the current tunnel were drafted in 1905 and construction got underway in 1906.  William Wilgus, Chief Engineer for the New York Central System, deserves most of the credit for the design.

Twin tubes encased in concrete were constructed by Great Lakes Engineering Works in St. Clair and floated down to the construction site, where there were buried in trenches dug into the river bed.

When opened, electric engines pulled trains compete with steam locomotives through the 4.5 mile tunnel and its approaches. They were replaced by diesels in 1953.

-1-
One of the original electric locomotives built by General Electric is now at the Henry Ford Museum, along with a steam crane used by the railroad.  The electric engines were powered by DC current supplied by Detroit Edison.

The now defunct Michigan Central Station was an extension of the tunnel project, built at the northern portal of the tunnel.  It was designed by Reed and Stanton of St. Paul, Minnesota, the same architects who designed Grand Central Station in New York.  The structure is currently owned by Matty Maroun, who also owns the Ambassador Bridge.

The Detroit River Tunnel was built and operated by the New York Central until the 1960’s, when the New York Central merged with the Pennsylvania to become the Penn-Central.  After the Penn-Central went bankrupt, the tunnel was taken over by Conrail, which sold it to the Canadian National and the Canadian Pacific in equal shares.  In 2004, CN sold its interest in the tunnel and CP sold the majority of its interest to Borealis, a division of the Ontario Municipal Employees Retirement System.  Operated by CP, that railroad now has a 16.5% interest in the tunnel while the majority is owned by Borealis.

A new tunnel adjacent to the current tunnel is now planned and going through environmental review.  It is expected that permission to build the tunnel will be granted by the end of 2011. Total cost of the project is estimated at $400 million.  It is uncertain at this time whether the new tunnel will be single or double track.

In the discussion period that followed Cosgrove’s talk, it was ascertained that $21.5 billion of the $137 billion in commerce crosses the Detroit River by rail at the current time.  A new tunnel will speed the movement of Canadian goods to the southern U. S.
Continental Rail Development is overseeing the project and hopes to begin construction in 2012.  Completion is anticipated by 2015.

 

Tischbein then introduced Bob Jones and Michael Melet of Michigan Solutions Group.  With an initial grant of $5,000 from MARP, Michigan Solutions Group offered to assume management of all MARP programs including publicity, public and governmental relations, website and fundraising.  Expenses would be covered by the initial grant, foundation grants, and memberships solicited by MSG.  They would push for passenger rail service to Northwest Michigan.

NO QUORUM: At this point it was determined that a quorum did not exist, so no action was taken on this proposal.

Minutes were reviewed and several corrections noted.  Due to lack of a quorum, they were not acted on.

Treasurer’s Report was not acted upon due to the lack of a quorum.

-2-
Michigan Central Station at Jackson: Langdon noted that the Friends of the Jackson Michigan Station will not be part of MARP.  As agreed to at the October meeting, MARP will donate $500 to that group to help pay for their charter as a separate organization.

Coordinator’s Reports:
Public/Governmental Affairs:  Langdon reported that the Michigan By Rail report had been written and was currently being reviewed by the staff at the Michigan Environmental Council.  He and Tim Fischer of MEC are now involved in Meet and Greet with each of the 148 legislators in Lansing, a fifteen minute meeting with each legislator to brief each one on MARP, MEC, Michigan By Rail and Amtrak.

The MEC Legislative Breakfast on February 9 was well attended by newly elected legislators.  Eight MARP members participated.

Transportation  For Michigan or Trans4M plans a big roll out in March, announcing their goal of developing a new and improved transportation policy for Michigan.  MARP has received the first installment of the $5,000 grant announced in January.  Charnetski suggested some of that grant go toward outreach materials.

Communications: No Report
Outreach: Tischbein handed out the most recent outreach schedule.  He noted that the most recent events were at the back of the schedule.

Regional Chapter Reports:
Metro Detroit: Hinkins announced that meetings were being held today at the Detroit Public Library to review the Woodward Light Rail Draft Environmental Statement.  TRU is organizing additional public meetings up and down the line.

Charnetski noted that the Ann Arbor Transportation authority is sponsoring twenty public meetings to gather input for their revised transportation plan which will include commuter rail and light rail.

East/Central: Pekarek reported on a second CN derailment recently in St. Clair County.  Wilson suggested putting a sign up in the Port Huron station noting the location of the Quik Trak machine at the Blue Water CVB.  Tischbein plans to meet with Wilson concerning Port Huron/Sarnia and invited others to join them.

Western: Langdon expressed pleasure that ridership on the Pere Marquette was up in January, along with the other Michigan routes.  He is currently doing a price comparison between the Pere Marquette and the Blue Water.  DeLora noted that Amtrak’s fare structure is a real challenge.

-3-
Next Meeting: The next meeting will be on Saturday, March 19 in Bangor.  The Executive Committee will meet at 10:00 a.m. and the General Membership Meeting will be at 11:00 a.m.

Other Business: Barb Westcott-Spaulding announced that the Mid Michigan Railroad Society was sponsoring a Chicago For Lunch excursion on April 26.  Participants will be able to travel from Flint or Durand to Chicago and back for $39.00 round trip.  Lunch will be on your own in Chicago.  Last year, approximately 70 people participated and Amtrak provided their own coach.  Reservations are due by April 17.

Adjournment: The meeting adjourned at 12:30 p.m.

Respectfully Submitted:    Accepted:

 

Hugh D. Gurney     Robert Tischbein
Secretary      Chair

 

 

 

 

 

 

 

 

 

 

 
-4-

DRAFT

MINUTES

MONTHLY
MEMBERSHIP MEETING

MICHIGAN ASSOCIATION OF RAILROAD PASSENGERS

DURAND
UNION STATION, DURAND

FEBRUARY 10, 2011

 

Those Signing
In:
Hugh Gurney, John DeLora, Steve
T. Sobel, Dick Pekarek, Clark Charnetski, Norma Ward, John D. Langdon, Kay
Chase, Dan Platz, Jim Hinkins, Robert Patterson, Diane Patterson, Pat Post,
Doug Wilson, Bob Tischbein

 

Also Present: Bob Cosgrove, Sylvia Sanders, Bob Jones,
Michael Melet, Dan Westcott, Barb Spaulding-Westcott

 

Call to Order: Chairman Tischbein called the meeting to
order at 10:05 a.m.

 

Guest Speakers: Tischbein first introduced Robert
Cosgove, a founding member of the Blue Water Chapter, National Railroad
Historical Society and currently Curator of the Glancy Train Collections at the
Detroit Historical Museum.  The Detroit River Railroad Tunnel celebrated
its 100th anniversary during the summer of 2010.  Despite being unseen, the tunnel handles 25
freight trains each day and moves 460,000 cars annually.

 

The first train through the tunnel was a westbound Canada
Southern passenger train called the Fast Western Express on July 26,
1910.  Previously, ferries carried trains
across the Detroit
River.  The Canada
Southern ferried cars across from just north of Amherstburg on the Canadian
site to Stony Island,
then bridged to Grosse Isle, then bridged again to the American side of the
river, then headed into the Brush Street Station in Detroit.
The Amherstburg Station is now the Gibson Gallery of Art and the Grosse
Isle Station now houses the Grosse Isle Historical Society.

 

A railroad bridge would have had to clear the 150 foot masts
of the sailing ships of the day, so a tunnel became the best option.  Plans for the current tunnel were drafted in
1905 and construction got underway in 1906.
William Wilgus, Chief Engineer for the New York Central System, deserves
most of the credit for the design.

 

Twin tubes encased in concrete were constructed by Great
Lakes Engineering Works in St. Clair and floated down to the construction site,
where there were buried in trenches dug into the river bed.

 

When opened, electric engines pulled trains compete with
steam locomotives through the 4.5 mile tunnel and its approaches. They were
replaced by diesels in 1953.

 

-1-

 

 

One of the original electric locomotives built by General
Electric is now at the Henry
Ford Museum,
along with a steam crane used by the railroad.
The electric engines were powered by DC current supplied by Detroit
Edison.

 

The now defunct Michigan Central Station was an extension of
the tunnel project, built at the northern portal of the tunnel.  It was designed by Reed and Stanton of St.
Paul, Minnesota, the same architects who designed Grand Central Station in New York.  The structure is currently owned by Matty
Maroun, who also owns the Ambassador
Bridge.

 

The Detroit River Tunnel was built and operated by the New
York Central until the 1960’s, when the New York Central merged with the Pennsylvania to become
the Penn-Central.  After the Penn-Central
went bankrupt, the tunnel was taken over by Conrail, which sold it to the
Canadian National and the Canadian Pacific in equal shares.  In 2004, CN sold its interest in the tunnel
and CP sold the majority of its interest to Borealis, a division of the Ontario
Municipal Employees Retirement System.
Operated by CP, that railroad now has a 16.5% interest in the tunnel
while the majority is owned by Borealis.

 

A new tunnel adjacent to the current tunnel is now planned
and going through environmental review.
It is expected that permission to build the tunnel will be granted by
the end of 2011. Total cost of the project is estimated at $400 million.  It is uncertain at this time whether the new
tunnel will be single or double track.

 

In the discussion period that followed Cosgrove’s talk, it
was ascertained that $21.5 billion of the $137 billion in commerce crosses the Detroit River by rail at the current time.  A new tunnel will speed the movement of
Canadian goods to the southern U. S.

Continental Rail Development is overseeing the project and
hopes to begin construction in 2012.
Completion is anticipated by 2015.

 

 

 

Tischbein then introduced Bob Jones and Michael Melet of
Michigan Solutions Group.  With an
initial grant of $5,000 from MARP, Michigan Solutions Group offered to assume
management of all MARP programs including publicity, public and governmental
relations, website and fundraising.
Expenses would be covered by the initial grant, foundation grants, and
memberships solicited by MSG.  They would
push for passenger rail service to Northwest Michigan.

 

NO QUORUM: At this point it was determined that a
quorum did not exist, so no action was taken on this proposal.

 

Minutes were
reviewed and several corrections noted.
Due to lack of a quorum, they were not acted on.

 

Treasurer’s Report was
not acted upon due to the lack of a quorum.

 

-2-

 

Michigan Central Station at Jackson:
Langdon noted that the Friends of the Jackson Michigan Station will
not be part of MARP.  As agreed to at the
October meeting, MARP will donate $500 to that group to help pay for their
charter as a separate organization.

 

Coordinator’s
Reports:

Public/Governmental Affairs: Langdon reported that the Michigan By Rail report
had been written and was currently being reviewed by the staff at the Michigan Environmental
Council.  He and Tim Fischer of MEC are
now involved in Meet and Greet with each of the 148 legislators in Lansing, a fifteen minute
meeting with each legislator to brief each one on MARP, MEC, Michigan By Rail
and Amtrak.

 

The MEC Legislative Breakfast on February 9 was well
attended by newly elected legislators.
Eight MARP members participated.

 

Transportation  For Michigan or Trans4M plans a big roll out in March,
announcing their goal of developing a new and improved transportation policy
for Michigan.  MARP has received the first installment of
the $5,000 grant announced in January.
Charnetski suggested some of that grant go toward outreach materials.

 

Communications: No Report

Outreach:
Tischbein handed out the most recent outreach schedule.  He noted that the most recent events were at
the back of the schedule.

 

Regional Chapter
Reports:

Metro Detroit: Hinkins announced that meetings
were being held today at the Detroit Public Library to review the Woodward
Light Rail Draft Environmental Statement.
TRU is organizing additional public meetings up and down the line.

 

Charnetski noted that the Ann Arbor Transportation authority
is sponsoring twenty public meetings to gather input for their revised
transportation plan which will include commuter rail and light rail.

 

East/Central: Pekarek reported on a
second CN derailment recently in St. Clair County.  Wilson suggested putting a sign up in the
Port Huron station noting the location of the Quik Trak machine at the Blue
Water CVB.  Tischbein plans to meet with Wilson concerning Port
Huron/Sarnia and invited others to join them.

 

Western:
Langdon expressed pleasure that ridership on the Pere
Marquette
was up in January, along with the other Michigan routes.  He is currently doing a price comparison
between the Pere Marquette and the Blue Water.  DeLora noted that Amtrak’s fare structure is
a real challenge.

 

-3-

Next Meeting: The next meeting will be on Saturday,
March 19 in Bangor.  The Executive Committee will meet at 10:00
a.m. and the General Membership Meeting will be at 11:00 a.m.

 

Other Business: Barb Westcott-Spaulding announced that
the Mid Michigan Railroad Society was sponsoring a Chicago For Lunch excursion on April 26.  Participants will be able to travel from Flint or Durand to Chicago
and back for $39.00 round trip.  Lunch
will be on your own in Chicago.  Last year, approximately 70 people
participated and Amtrak provided their own coach.  Reservations are due by April 17.

 

Adjournment: The meeting adjourned at 12:30 p.m.

 

Respectfully Submitted:                                             Accepted:

 

 

 

Hugh D. Gurney                                                         Robert
Tischbein

Secretary                                                                     Chair

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-4-

Meeting minutes – Executive Committee – Feb. 10 , 2011 – Durand

DRAFT
MINUTES
MICHIGAN ASSOCIATION OF RAILROAD PASSENGERS
EXECUTIVE COMMITTEE MEETING
DURAND UNION STATION, DURAND
FEBRUARY 10, 2011

Present: Gurney, Tischbein, Hinkins, Langdon, Chase

Call to Order: Chairman Tischbein called the meeting to order at 9:00 a.m.  After some discussion, it was determined that a quorum did not exist and that no official business could be transacted.  However, several items were discussed in the hope that they would facilitate business at future meetings.

Executive Committee Meetings: It was the consensus of those present that Executive Committee Meetings held one hour prior to the scheduled monthly meetings could resolve a number of business items, thus shortening the monthly meetings.  Because several members indicated difficulty in getting to meetings all across the state by 9:00 a.m., it was the consensus of those present that Executive Committee meetings should generally be held at 10:00 a.m., with the membership meeting commencing at 11:00 a.m.

2011 Priorities: A list of priorities submitted by Gurney was discussed, along with others submitted by Tischbein and Newell.  Since all members of the Executive Committee had not submitted their list of priorities and since a majority were not present, it was agreed to defer the matter to a future meeting.

Vision Statements: Chase shared a list she had compiled showing the MARP Purpose as described in the By-Laws, MARP Goals as listed in the Membership Brochure and draft Sponsorship Brochure, and MARP’s Vision Statement as developed by the Route Enhancement Committee.  She suggested we review these documents and be more consistent in future publications.

MARP Regions: Gurney discussed changes Monteith had requested in the boundaries of  the Northern Region to facilitate his wish to work more closely with the various freight railways serving Northern Michigan.  Those present suggested moving Mason and Lake counties from the Northern Region to the Western Region as recommended by Monteith, but keep Genesee, Shiawassee and Clinton counties in the East/Central region as agreed to at the October retreat.  Tischbein noted that he could designate Monteith as liaison to Michigan short line and regional railroads as a separate and distinct position from Regional Chair of the Northern Region.  Gurney will prepare maps for all concerned.

Meeting adjourned at 10:00 a.m.

 

Respectfully submitted:                                  Accepted:

Hugh D. Gurney                                             Robert Tischbein

Secretary                                                         Chair

Plans unveiled to redesign B.C.’s Amtrak station

From the Battle Creek Enquirer

A peek at the future of Battle Creek’s downtown passenger train station was released Wednesday.

The plans by local firm Architects Incorporated would move the station’s main entrance to face McCamly Street and add more outdoor canopies for waiting passengers.

“I think we’re going to have a really nice facility when we’re done, and I hope people are proud of it and more inclined to use it,” said Larry Bowron, who recently was named the city’s transportation director after filling the position on an interim basis for more than a year.

Drawings of the redesigned interior are not finalized, but Bowron said the station’s dated insides will be improved to give the station a warmer and welcoming feel.

The $3.6 million project was announced in January 2010 as part of $40 million in federal economic stimulus money awarded to Michigan to improve the rail corridor linking Detroit and Chicago. Stations in Dearborn and Troy also are getting upgrades.

The funding and similar grants are part of a federal push to create a high-speed rail line across southern Michigan that would cut through Calhoun County.

The Battle Creek station plans also call for a more secure long-term parking area that passengers would continue to access from Capital Avenue.

Bowron said vehicle break-ins had discouraged people from using the long-term parking, but a new fence and video monitoring system should make people more comfortable about leaving their cars at the station overnight. Additional lighting also will help security and make the station more visible, he said.

The city is using another stimulus award to relocate the bus transfer center from next to the train station to across McCamly Street. The Battle Creek City Commission on Tuesday approved a contract worth $230,262 for the project, and Bowron said work could start next week.

He said he hoped to have a contract for the station redesign finalized in late June. Work would then begin after July 4 and take about eight months to complete.

The project won’t interfere with Amtrak’s service schedule but will require Amtrak personnel be temporarily relocated to Kalamazoo, which will affect ticketing, Bowron said.

Amtrak spokesman Marc Magliari said when a ticketing window isn’t open, the company will work to maintain service either through its electronic ticketing kiosk or other means. Customers won’t have to pay extra fees in this case, he said.

The station was built in 1982. Amtrak reported that it served as the starting point or end destination for 52,000 passengers last year.

Source: http://www.battlecreekenquirer.com/article/20110519/NEWS01/105190319/Plans-unveiled-redesign-B-C-s-Amtrak-station?odyssey=nav|head

Special report: All aboard the Pere Marquette

From Up North Live

With gas around four dollars a gallon, all of us are looking for cheaper ways to get around, and that is helping the train industry get back on track.

7&4’s Lauren Amstutz shows us how ridership for Amtrak is on the rise and why taking the rain can be a fun and inexpensive way to vacation.

The day started bright and early. After parking for free at the Amtrak station in downtown Grand Rapids, I joined others near the tracks excited for the train’s arrival.

The Pere Marquette service arrived in Grand Rapids every morning at 7:30, and today was no different. The route makes stops in Holland, Bangor, Saint Joseph-Benton Harbor and finally Chicago, Illinois.

Train Conductor, David Pryor says, “A lot of people do not know that you can go to Chicago for a day have a great time and be totally relaxed in both directors without the hecticness of security and the airport.”

Pryor has a point, not only did I avoid any kind of security line, but the seats are spacious and comfortable, something travelers really seem to enjoy.

Amtrak Passenger Ben Hull says, “In a plane if you don’t ride 1st class you are going to be very compact, the seats would be much smaller than this.”

Ben Hull is on his way to the Windy City for a visit with his brother who is attending college there. Besides a fear of driving in big city traffic, riding the train is his time to unwind.

Hull says, “In the car when you’re driving you have to concentrate on driving, I’ve been doing school work for a while.”

Hate driving, love relaxing, despise the cost of gas, whatever the case Amtrak’s popularity is increasing and ridership numbers in Michigan prove it.

From October 2010 to March of this year, ridership on the Pere Marquette Route increased 6.7%. Ticket revenue was up 11.7% to almost $1.5 million.

Other Michigan routes saw increases too. Amtrak’s Wolverine service from Pontiac to Chicago increased 16.3%.

Ridership on the Blue Water Service, that’s East Lansing to Chicago saw a 26.2% increase in ridership.

Pryor says, “The best part about train travel is that we go from one downtown to the other downtown so you are not on the outskirts of town like most airports.”

After passing small towns, and views of Lake Michigan we finally arrived in Chicago. The entire trip took about three hours.

Read more/ see video: http://www.upnorthlive.com/news/story.aspx?id=620077

Update on Ann Arbor’s Fuller Road Station‏

From The Ann Arbor Chronicle

This month’s Ann Arbor Parks Adisor Commission meeting focused on one topic – an update on the proposed Fuller Road Station, a large parking structure, bus depot and possible train station being planned on city-owned property near the University of Michigan’s medical campus.

Eli Cooper, the city of Ann Arbor’s transportation program manager, reprised a presentation he’s given dozens of times over the last two years to various public bodies and community groups. The newest details relate to recent federal funding earmarked for the project – $2.8 million from the Federal Rail Administration, to pay for environmental assessment and engineering at the site. Cooper admitted he had started to feel a bit like the boy who cried “Wolf!” regarding potential funding, but he noted that the “wolf” has materialized – in the form of the grant award.

Read more: http://annarborchronicle.com/2011/05/21/pac-gets-update-on-fuller-road-station/